生产项目管理 18-24k·15薪
南京 3-5年 本科
收藏
avator
吴女士 1天前在线
顾问 · 上海岱澳人才信息咨询有限公司
简历处理快
聊一聊
职位介绍
Main responsibilities are: 1. Design to Manufacturing The PML Participates to the Product Design activities led by the PDL (Program Development Leader), contributing in reaching a product design compliant with Faurecia Industrial Targets and allowing maximum Production Profitability. He Leads Technology and Process comparative studies in case of several possible alternatives and makes sure Process Feasibility is given and validated by experts 2. Footprint and Make or Buy Studies With the support of his management and giver the program context, PML conducts the appropriate footprint studies and required Make or Buy comparative Studies. PML submits it to the Industrial Strategy for final decision. 3. Production System Definition In the early phase of program, PML organizes, leads and follow-up the FES Industrial Design Workshop during Development Phase (EDW) involving full Program and Plant team, under the coordination of his PML manager. Based on a first preliminary theoritical production layout delivered by the plant, he build the preliminary program theoritical plant internal MIFD. Before Program CAR Committee Meeting, leads the FES Tool and machine Design Workshop (Cardboard), out of which plant delivers the detailed Production Line layout and internal MIFD. Confirm the proposed Production System including traceability and conformity. Contributes and validates the MIFD, final layout. PML identifies and follow-up Industrial risks and define the back-up plan for critical processes. Check, share and take advantage of any relevant Lesson Learnt from similar process. Provide Industrial Impact on any Engineering Change Request PML leads the assessment of the refurbishment needs for the program relying on the appropriate internal or external experts and validate the effective equipment refurbishment 4. Process FMEA PML participates in the definition of Key Product Characteristics (KPC) and Key Control Characteristics (KCC) He coordinates and leads the PFMEA methodology during program phase with active participation of PTEs, Process Experts (GTS), Plant. Once PFMA completed, ensure action implementation and PFMEA update according advancement and then transfer PFMEA to plant at MPT when all required action implemented. Job Description 保密 Confidential. 5. CAR Committee PML prepares and leads the Program CAR Presentation with Program and Plant Support and Validation. He ensures Mcload update with additional equipment brought by program Once CAR presented, he ensures CAR submission and follow-up according targeted industrial timing. 6. Industrial Timing PML builds, updates & monitors the complete Program Industrial timing plan for tools, equipment, Packaging, Traceability and associated processes to reach MPT and SOP on time and right first time from specification to final acceptance. He coordinates Program PTE and Supply Chain Engineers within Program Team and track Plants readiness level though IPMs The PML is in charge of coordinating Traceability Implementation, Machines and tool Acceptance, making sure complete and robust PDCA is implemented and tracked. Responsible to organize T&E progress status reviews involving the plant 7. Industrial Performance PML defines and tracks main Industrial Performance indicators: • MOD Headcount and Work Content • Scrap Process rate • Process Capablities • Capacity Status and Process Cycle Time, including TRS Monitoring (data from plant) • Rework monitoring (data coming from PDL and plant) • Material Yield • Launch Costs consolidated in the BP (estimated and followed by plant) 8. Program Investment PML is in charge of making sure that profitable solutions for Program Financial KPI improvement are investigated through standard, automation, digitalization with payback analysis. He optimizes Program Investment through Reuse, Bundling, Massification etc.. He also builds, updates & monitors the detailed Program Investment List, submitting CAR request and approval follow-up. 9. PMS-PRC Reporting PML reports Manufacturing Milestones in Faurecia PMS system in coordination with Supply Chain, Plants and PTEs. He provides to Costing the Industrial target data for BP update All PMLs participate to PML Department Weekly routine
其他信息
语言要求:不限
行业要求:整车制造

职位透镜

您与该职位的匹配度: 登录查看
lens

猎聘温馨提示:

1. 如您发现平台内招聘方存在以下违规行为的,请立即举报
  • a. 扣押您的身份证件或者其他证件;
  • b. 要求您提供担保人、担保金或者以其他名义向您收取财物( 如培训费、体检费、资料费、置装费、押金等);
  • c. 强迫您入股或者向您集资;
  • d. 以招聘名义牟取不正当利益;
  • e. 发布虚假招聘广告信息;
  • f. 存在其他损害您的合法权益的行为。
2. 如您应聘的岗位属于涉外劳务合作/海外岗位的,请务必核实招聘方对外劳务合作资质取得情况,同时注意自身资金安全,防范招聘欺诈。
查看全部

猜你喜欢

项目经理(汽车行业)
南京-江宁区
21-30k
某宁波新能源公司
新能源 融资未公开 100-499人
王女士
招聘顾问
产品项目经理
南京-江宁区
20-30k·13薪
某生活服务公司
生活服务 融资未公开 5000-10000人
裴女士
资深顾问
1 2 3 4